5A. Attach Upper Yoke (To Angle Irons) - BIG ASS FANS powerfoil x2.0 Installation Manual

Washdown
Hide thumbs Also See for powerfoil x2.0:
Table of Contents

Advertisement

5a. Attach upper yoke (to angle irons)

If the fan will be directly mounted to the angle irons, skip this step and proceed to step 5b.
Before drilling the angle irons, confirm that you have the appropriate mount to accommodate the roof pitch of your
mounting structure.
Secure the upper yoke directly to the angle irons with the Upper Yoke Hardware as shown. The angle irons should be aligned with the
outermost holes of the upper yoke. Consult the diagrams below for distances between the angle irons.
Tighten the bolts to 40 ft·lb (54.2 N·m) using a torque wrench and 3/4" socket. After attaching the upper yoke to the angle irons, tighten
all the bolts securing the angle irons to the roof structure to 40 ft·lb (54.2 N·m).
Proceed to "Hanging the Fan" (p. 19).
Upper Yoke Hardware (BAF-Supplied):
a. (4) 1/2-13 x 2" GR 8 Bolt
b. (8) 1/2'' Flat Washer
c. (4) 1/2-13 Nylock Nut
10-7/8" (27.6 cm)
Small Upper Yoke
13-3/4'' (34.9 cm) x
9-5/8" (24.4 cm)
Note: Dashed lines represent angle irons in the above illustrations.
The angle irons should be aligned with the outermost holes on the upper yoke. Do not use beam clips on angle irons!
8'–24' POWERFOIL
X2.0 WASHDOWN & POWERFOIL
®
Mounting Structure: Bar Joists (cont.)
WWW.BIGASSFANS.COM
©2012 DELTA T CORP.
X2.0 PLUS WASHDOWN
®
15-5/8" (39.7 cm)
Large Upper Yoke
18-1/2''(46.9 cm) x
9-5/8"(24.4 cm)
Side View
a
b
b
c
ALL RIGHTS RESERVED
17

Advertisement

Table of Contents
loading

Table of Contents