5.2 Environmental Requirements for Device Operation

5.2.1 Environmental Requirements for an Equipment Room
Requirements for Selecting a Site for an Equipment Room
When designing a project, consider the communication network planning and technical
requirements of the equipment. Also consider hydrographic, geological, seismic, power supply,
and transportation factors.
Construction, structure, heating and ventilation, power supply, lighting and fire fighting of the
equipment room should be designed by specialized construction designers to suit the
environmental requirements of devices. The equipment room should also follow local
regulations concerning the industrial construction, environmental protection, fire fighting, and
civil air defense. Construction must conform to government standards, regulations, and other
requirements.
Issue 02 (2014-12-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Appendix
86

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ap8130dn

Table of Contents