Environmental Requirements For Device Operation - Huawei AP7050DE Hardware Installation And Maintenance Manual

Hide thumbs Also See for AP7050DE:
Table of Contents

Advertisement

AP7050DE
Hardware Installation and Maintenance Guide
Figure 5-77 Mold installed in the COAX crimping tool
Figure 5-78 An installed mold
----End

5.2 Environmental Requirements for Device Operation

5.2.1 Environmental Requirements for an Equipment Room
Requirements for Selecting a Site for an Equipment Room
When designing a project, consider the communication network planning and technical
requirements of the equipment. Also consider hydrographic, geological, seismic, power
supply, and transportation factors.
Construction, structure, heating and ventilation, power supply, lighting and fire-proof
construction of the equipment room should be designed by specialized construction designers
to suit the environmental requirements of devices. The equipment room should also follow
local regulations concerning the industrial construction, environmental protection, fire safety,
and civil air defense. Construction must conform to government standards, regulations, and
other requirements.
Issue 01 (2016-04-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Appendix
69

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents