Toro Workman HDX Service Manual page 133

Hide thumbs Also See for Workman HDX:
Table of Contents

Advertisement

10.Disassemble PTO intermediate shaft:
A. Use a bearing puller to remove bearing (item 1) if
necessary.
11. Disassemble PTO output shaft:
A. Use a bearing puller to remove bearing (item 1).
B. Remove gear (item 2) and retaining ring (item 3).
C. Remove retaining ring (item 4) and thrust washer
item 5).
D. Use a bearing puller to remove bearing (item 6) if
necessary.
12.Disassemble shift arm:
A. Remove two (2) lock pins from shift arm.
B. Remove two (2) O--rings (item 1).
Workman HD Series
6
2
3
1
Page 6 - - 57
1
Figure 121
Figure 122
5
4
Figure 123
Figure 124
Drive Train
7
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Workman hdWorkman hdx--d

Table of Contents