11. Remove, all at the same time, reduction shaft as-
sembly (item 1), 2nd--3rd shift assembly (item 2), coun-
tershaft assembly (item 3) and High--Low shift assembly
(item 4).
12.Loosen five (5) flange head screws (item 1) and re-
move L.H. axle shaft assembly (item 2) and shims (item
3) from L.H. side cover (item 4) still attached to trans-
axle.
13.Remove roll pin from differential lock lever. Remove
lever (item 1) from shaft. Loosen and remove five (5)
flange head screws (item 2). Remove L.H. side cover
(item 3) from transaxle case.
14.Inspect side cover for cracks or damage and replace
if necessary.
15.Loosen and remove four (4) flange head screws
(item 1). Remove R.H. axle shaft assembly (item 2) from
transaxle case.
Drive Train
2
1
3
1
2
Page 6 - - 24
4
3
Figure 31
Figure 32
2
1
Figure 33
Figure 34
Workman HD Series

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Workman hdWorkman hdx--d

Table of Contents