1) Frame in the enclosure for the unit with framing material.
IMPORTANT: Vertical studs and the header must be metal.
Note: When constructing the framed opening, please ensure there is
access to install the gas lines when the unit is installed.
2) The unit does not have to be completely enclosed in a chase. You must
maintain clearances from the vent to combustible materials: See "Clear-
ances" section. Combustible materials can be laid against the side and
back standoffs and the stove base.
3) Non-combustible material (ie. tile, slate, etc) may be brought up to and
overlap the unit (top and bottom) ensuring that the maximum thickness
does not go beyond the 1-1/2" as shown in the diagram below. The
faceplate will not be able to be mounted if the fi nished material is beyond
1-1/2".
Note:
Depending on the material used for fi nishing, the nailing strips must be set ac-
cordingly so that the fi nished material is always at the 1-1/2" edge of the fl ange.
4) If material such as brick, stone, etc. extends past the faceplate depth,
when fi nishing around the faceplate, the minimum opening dimensions
noted below must be adhered to ensuring for the removal of the faceplate
and for the safe operation of this appliance.
Regency Horizon™ HZ42STEPV Gas Fireplace
FRAMING & FINISHING
5) For material such as brick, stone, etc that extends less than 1-1/2" ,
the minimum opening dimensions noted below must be adhered, when
fi nishing around the faceplate. This is to ensure the longevity of the
fi nishing material and for the safe operation of this appliance.
41-7/8"
Unit shown without faceplate
Finished
Nailing Strip
Material
Position
1/2"
1"
1"
1/2"
1-1/2"
0" (fl ush)
INSTALLATION
Nailing Strip
1" Forward
Unit
Nailing Strip
½" Forward
Unit
Nailing Strip
Flush w/unit
Factory Set
Unit