Sharp MX-M283N Installation Manual page 61

Digital multifunctional system
Hide thumbs Also See for MX-M283N:
Table of Contents

Advertisement

C. Check the packed items
1)
Check that all the items are included in the package.
1
2
4
5
7
P
No.
Names of bundles
1
P tight M4x12
2
Step screw A
3
Cap screw M3x6
4
Binding head M4x12
5
Front cover
6
Front cover mounting fixture
7
Connection fixture F (for punch)
8
Connection fixture R (for punch)
2. Installation
<Note before installation>
* Before installing the MX-PNX6A/B/C/D, unpack the MX-FN11.
A. Installation of punch unit
1)
Attach the step screw A (Package part No. 2) to the finisher.
2)
Remove the fixing screw, and remove the connector cover on
rear side of the finisher.
3
6
8
P
Quantity
1
2
3
4
1
1
1
1
MX-M503N MX-PNX6A/B/C/D 10 – 2
3)
Hang the punch unit on the step screws installed to the fin-
isher.
2
4)
Tighten the step screws bundled to the punch unit, fix the
punch unit.
5)
Attach the front cover mounting fixture (Package part No. 6)
with the fixing screws (Package part No. 3).
Remove the screw of the finisher, and reuse it. Install it using
the reuse screw, and three fixing screws (Package part No. 3)
bundled to punch unit.
2
3
1
1

Advertisement

Table of Contents
loading

Table of Contents