Power Control] Window; Figure 1.125 [Power Control] Window - Fujitsu PRIMEQUEST 2000 Series Tool Reference

Hide thumbs Also See for PRIMEQUEST 2000 Series:
Table of Contents

Advertisement

MMB Web-UI (Web User Interface) Operations
1.7 [System] Menu for PRIMEQUEST 2800B2/2800B

1.7.7 [Power Control] Window

[Power Control] window displays the power control of the system.
Remarks
When the operating system supports ACPI (Advanced Configuration and Power Interface), the power can be
turned Off after the operating system is Shutdown by Power Off operation. If ACPI is not supported, power
can be Off without the Shutdown of the operating system. Moreover, even if the operating system supports
ACPI, and applications running on the operating system are not supported, sometimes power Off is not
possible. Since these depend on the specifications of the operating system and applications, for details, refer
to the operating system and application specifications.
1.
Select the process executed for the system from Pull-down menu of [Power Control].
Then, click the [Apply] button.
Dialog box for confirmation appears.
2.
Click the [OK] button to execute the process.
Click the [Cancel] button to cancel the process.
When system Power is On, or when Power is Off, and when the specified control is failed,
Warning dialog box appears.
When the CPU mounted on the SB of system is not matched at the time of specifying the Power On of
system, Warning dialog box appears. Error occurs in the Power On operation.

FIGURE 1.125 [Power Control] Window

299
CA92344-0539-04

Advertisement

Table of Contents
loading

Table of Contents