Removal Of Electrical Box - Daikin FTXS20K2V1B Service Manual

Inverter pair wall mounted type k-series
Hide thumbs Also See for FTXS20K2V1B:
Table of Contents

Advertisement

SiBE041134
2.2

Removal of Electrical Box

Procedure
Step
1
Disconnect the
connector for the
overload protector
[S40].
2
Disconnect the
connector for the four
way valve coil [S80].
3
Disconnect the 2
connectors for the
reactor.
Removal Procedure
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Procedure
Points
Preparation
Remove the panels and
disconnect the connector for
the fan motor according to
the "Removal of Outer
Panels / Fan Motor".
[S40]
(R11846)
[S80]
(R11848)
The colors of the harnesses
(white or brown) do not
matter to the position of the
connector.
(R11844)
Outdoor Unit
143

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ftxs25k2v1bRxs20k2v1bRxs25k2v1b

Table of Contents