Toyota T100 1996 Service Manual page 848

1996 toyota t100
Table of Contents

Advertisement

EM−20
length = 145 mm
(5.71 in.)
SST
1996 TOYOTA T100 (RM449U)
ENGINE MECHANICAL (5VZ−FE)
Length = 425 mm
(16.73 in.)
P20918
P21686
SST
P20516
P20828
P20827
TIMING BELT
5.
INSTALL NO.1 TIMING BELT COVER AND STARTER
WIRE BRACKET
(a)
Check that the timing belt cover gaskets have cracks or
peeling, etc.
If the gasket does have cracks or peeling, etc., replace it using
following steps.peeling, etc., replace them using following
steps.
Using a screwdriver and gasket scraper, remove all
S
the old gasket material.
Thoroughly clean all components to remove all the
S
loose material.
Remove the backing paper from a new gasket and
S
install the gasket evenly to the part of the belt cover
shaded back in the illustration.
(b)
Install the timing belt cover with the 4 bolts.
Torque: 9 N·m (90 kgf·cm, 80 in.·lbf)
(c)
Install the starter wire bracket with the 2 bolts.
6.
INSTALL CRANKSHAFT PULLEY
(a)
Align the pulley set key with the key groove of the pulley,
and slide the pulley.
(b)
Using SST, install and torque the bolt.
SST
09213−54015 (90119−08216),
09330−00021
Torque: 250 N·m (2,500 kgf·cm, 184 ft·lbf)
7.
INSTALL LH CAMSHAFT TIMING PULLEY
(a)
Slide the timing pulley, facing the flange side outward.
(b)
Align the knock pin hole of the camshaft with the knock pin
groove of the timing pulley as shown.
(c)
Install the knock pin.
(d)
Using SST, install and torque the bolt.
SST
09960−10010 (09962−01000, 09963−01000)
Torque: 110 N·m (1,100 kgf·cm, 81 ft·lbf)
8.
SET NO.1 CYLINDER TO TDC/COMPRESSION
(a)
Crankshaft Position:
Turn the crankshaft pulley, and align its groove with the
"O" timing mark of the No.1 timing belt cover.

Advertisement

Table of Contents
loading

Table of Contents