Powering Off The Srx5600 Services Gateway - Juniper SRX5600 Hardware Manual

Services gateway
Hide thumbs Also See for SRX5600:
Table of Contents

Advertisement

Powering Off the SRX5600 Services Gateway

Related
Documentation
Copyright © 2014, Juniper Networks, Inc.
Chapter 9: Grounding and Providing Power to the SRX5600 Services Gateway
NOTE:
After powering off a power supply, wait at least 60 seconds before
turning it back on.
To power off the services gateway:
On the external management device connected to the Routing Engine, issue the
1.
operational mode command. The command shuts down the
request system halt
Routing Engine cleanly, so its state information is preserved.
user@host> request system halt
Wait until a message appears on the console confirming that the operating system
2.
has halted.
For more information about the command, see Junos OS System Basics and Services
Command Reference at
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
3.
the strap to one of the ESD points on the chassis.
On an AC-powered services gateway, switch the AC switch on each power supply to
4.
the off position (
). On a DC-powered services gateway, switch the circuit breaker
O
on each power supply to the off position (
Preventing Electrostatic Discharge Damage to the SRX5600 Services Gateway on
page 195
Overview of Installing the SRX5600 Services Gateway on page 39
Powering On an AC-Powered SRX5600 Services Gateway on page 75
Powering On a DC-Powered SRX5600 Services Gateway on page 79
www.juniper.net/techpubs/
).
OFF
.
81

Advertisement

Table of Contents
loading

Table of Contents