Flue Collar Installation - Heatilator PT60 Owner's Manual

Zero clearance pellet fireplace installation and operation
Table of Contents

Advertisement

POINTE Pellet Fireplace
Vertical Installation (Cont'd)
Pipe
Liberally silicone
all around flue
collar before
inserting into pip
e
Top Cover Plate
Figure 36.1
Drill Holes for Screws
above Locating Pins
X
Locating Pin
on Each Side
Figure 36.2
Figure 36.3
Attach rear cover plate
with hole at the top and
secure in place.
Figure 36.4
Page 36
Flue Collar
Insert assemblied
pipe and flue collar
through top of outer
can and over gasket.
Secure in place
with 4 screws
Secure top
cover plate in
place.
Horizontal Installation
1. Remove the fl ue collar and orange gasket from the component
pack. Push out the 6 slugs in the gasket.
2. Remove the rear cover plate. Save screws and plate for later
re-attachment.
3. Place the orange fl ue gasket over the locating pins on the
exhaust fl ue transition on the back of the fi replace. Figure
35.2 on page 35.
4. Position the fl ue collar over the gasket and secure in place.
Figure 36.5.
5. Position the rear cover plate,secure in place. Figure 36.6.
6. Before placing the pipe over the fl ue collar, liberally silicone
the end of the fl ue collar with Hi-Temp silicone about 1-1/2
inches (38mm) wide.
7. Drill holes through the pipe walls directly into the fl ue collar
one on each side, 180 degrees apart. Screw the pipe to the
fl ue collar with 2 screws. Figure 36.7.
Locating Pins each Side
Flue Collar in Horizontal Position
Figure 36.5
Secure pipe to flue collar with 2
screws, 180 degrees apart
Figure 36.7
7051-507
Rear Cover Plate
Installed with Hole
at the Bottom
Figure 36.6
Liberally silicone flue collar
before placing pipe over collar.
April 29, 2011

Advertisement

Table of Contents
loading

Table of Contents