F. Recommended Sequence of Installation
NOTICE:
• Read and understand Sections 6 through 10 for detailed
information before installing the fi replace.
• Follow all clearances as specifi ed.
• The choice of fi nishing material and decorative front
must be determined before installation can begin as it
will determine the placement of the fi replace.
• Outside air is required on all installations and the Outside
Air Kit must be ordered separately.
Recommended Sequence
1.
Identify the exhaust vent and outside air locations
and install necessary venting components including
wall thimble, fi re stop or roof fl ashing for a verti-
cal termination. NOTE: Outside Air Kit must be
ordered separately.
2.
Complete the framing.
3.
Install the electrical junction box near the electrical
opening on the left side of the appliance. Maximum
distance of 9 inches (229mm) from appliance.
4.
Identify the location of the wall control and run the
wire (25 ft [7.62 meters] in length) to the left side of
the appliance.
5.
Prepare the fi replace for the exhaust vent adapter.
Install adapter, seal with high temp silicone and
screws and install all cover plates.
6.
Preset the nailing fl anges depending on the thick-
ness of your fi nishing material.
7.
Ensure that fi replace is level before securing in
place. If not level the decorative front will not swing
out properly.
8.
IT IS CRUCIAL FIREPLACE IS ROBUSTLY
SECURED. Slide the fi replace into place and
secure to the fl oor with the securing brackets and to
the wall.
See page 33 for detailed instructions.
9.
Attach the exhaust and outside air venting to the
appliance.
10. Hook up power and the wall control.
11. Slide the fi replace out on the rail system to validate
that it is secure and there is no defl ection in the
outer can.
12. Slide the fi replace back into the outer can. Re-attach
the bolts and brackets. Double check they are cor-
rectly positioned to ensure the exhaust gaskets are
properly sealed to prevent combustion leakage.
13. A burn test must be performed before fi nishing
material is installed. (See Item "G").
14. Install the fi nishing material.
15. Install the decorative front.
Page 24
G. Items to Verify During Test Burn
• Check for leaks in the exhaust venting system. Do you
see any smoke?
Remember on a fi rst burn odors and vapors
are released due to the curing of the high tem-
perature paint. The focus is on the venting
system.
• Check overall operation, are there any error codes on
the Wall Control?
• Confi rm that outside air is hooked up and properly sealed.
Is there cold air infi ltration?
• The fi replace must be secured in place as outlined in
Section 6 and 7.
• When servicing the fi replace, the fi replace slides
foward on the rail system.
• Tipping can occur if fi replace is not properly secured
to the fl oor.
7051-507
WARNING
Crush Hazard!
To avoid tipping over, this
appliance must be securely
fastened to the fl oor.
April 29, 2011