Locating Your Thermostat Wall Control; Tools & Supplies Needed; Inspect Appliance And Components; Checklist To Help Determine Location - Heatilator PT60 Owner's Manual

Zero clearance pellet fireplace installation and operation
Table of Contents

Advertisement

B. Thermostat Wall Control Location
The thermostat wall control's location will have some affect
on the appliance's operation.
• Maximum wire length from appliance is 100 feet (30.48m)
continuous unspliced wire. Recommended 20 gauge wire,
solid copper
.
When located close to the appliance, it may require a
slightly higher temperature setting to keep the rest of the
house comfortable.
When located in an adjacent room or on a different fl oor
level, you will notice higher temperatures near the appli-
ance.
CAUTION! The wall control is an integral part of the appli-
ance. No other wall control or thermostat can be substi-
tuted.
C. Tools And Supplies Needed
Tools and building supplies normally required for instal-
lation.
Reciprocating Saw
Hammer
Phillips Screwdriver
Tape Measure
Plumb Line
Level
Framing Material
Hi-temp Caulking Material
Gloves
Safety Glasses
D. Inspect Appliance and Components
WARNING! Risk of Fire! Damaged parts could impair safe
operation. Do NOT install damaged, incomplete or substitute
components.
Open the appliance and remove all the parts and articles
packed inside the Component Pack. Inspect all the parts
and glass for shipping damage.
Report to your dealer any parts damaged in shipment.
All labels have been removed from the glass door.
Plated surfaces have been wiped clean with a soft cloth,
if applicable.
Read all the instructions before starting the installation.
Follow these instructions carefully during the
installation to ensure maximum safety and benefi t.
Follow pipe manufacturer instructions for installation
and air clearance requirments.
April 29, 2011
Wire Nuts
7/16 inch Socket Wrench
Framing Square
Electric Drill & Bits
Self-Tapping Screws
Outside Air Required
Class L or PL Pellet Vent
May also need:
Vent Support Straps
E. Checklist to Help Determine Location
Vent termination location - vertical or horizontal
Venting clearances
Outside air location (3 options)
Electrical connection
Location of thermostat wall control
Clearance to combustibles
Mantel projection fuel loading clearances
Sidewalls, surrounds and trim clearances
Hearth extension fl oor protection
Height for loading fuel into hopper if installed on a
raised platform
Allow enough clearance to open front when
installing fi nishing material that protrodues
beyond the mounting frame.
Thickness of fi nishing material
Service space clearances
7051-507
POINTE Pellet Fireplace
Description
Page 23

Advertisement

Table of Contents
loading

Table of Contents