UPS Installation Plan and Unpacking
If battery systems are located in the same room as the UPS, the battery manufacturer's
environmental requirements should be followed if they are more stringent than the UPS
requirements. Operating temperatures above the recommended range will result in decreased
battery life and performance, and may reduce or void the battery warranty.
The UPS ventilation requirements are shown in Table 3-4.

Table 3-4. Air Conditioning or Ventilation Requirements During Full Load Operation

Model
Eaton 9E-100/80
Eaton 9E-100/100
Eaton 9E-120/120
Eaton 9E-200/160
Eaton 9E-200/200

3.2.2 UPS System Power Wiring Preparation

The UPS system installation must meet the following guidelines:
• The system must be installed on a level floor suitable for computer or electronic equipment.
• The system must be installed in a temperature and humidity controlled indoor area free of conductive
contaminants.
Failure to follow guidelines may void your warranty.
The UPS equipment operating environment must meet the weight requirements shown in Table 3-1 and the
size requirements shown in Figure 3-1. Dimensions are in millimetres (inches).
Backfeed protection is an internally fitted option on this device. If this option, or an externally fitted
backfeed contactor are not installed, the below label should be applied on all primary power
isolators installed remote from the UPS area and on external access points.
3-6
Eaton 9E UPS (80-200 kVA, 380/400/415V) Installation and Operation Manual
Rating
Input/Output Voltage
80 kVA
380/380 400/400 415/415
100 kVA
380/380 400/400 415/415
120 kVA
380/380 400/400 415/415
160 kVA
380/380 400/400 415/415
200 kVA
380/380 400/400 415/415
HIGH TOUCH CURRENT EARTH CONNECTION ESSENTIAL BEFORE CONNECTING SUPPLY.
As a result of the connected loads high leakage current is possible. Connection of the earth
(ground) is required for proper product operation. Do not check UPS operation by removal of
the Earth (ground) connection.
The UPS unit is not suitable for IT and corner-earthed power distribution systems.
- ISOLATE UNINTERRUPTIBLE POWER SYSTEM (UPS)
- THEN CHECK FOR HAZARDOUS VOLTAGE BETWEEN ALL
TERMINALS INCLUDING THE PROTECTIVE EARTH
自 动反 向 馈 电危险 ! 线路 施 工前, 请断 开UPS,
确 保 所有 端 子 之间包括 保 护地没 有危险 电压 。
CAUTION
BTU/hr x1000 (kg-cal/hr)
WARNING
WARNING
BEFORE WORKING ON THIS CIRCUIT
RISK OF VOLTAGE BACKFEED
Heat Rejection
18.49 (4660)
23.11(5826)
27.74(6991)
36.99(9322)
46.23(11651)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

93e

Table of Contents