Figure 3-4. Ups Cabinet As Shipped On Pallet (Wood Container Removed) - Eaton 9E Installation And Operation Manual

80–200 kva (380/400/415v)
Hide thumbs Also See for 9E:
Table of Contents

Advertisement

UPS Installation Plan and Unpacking
4.
Remove the protective wood container from the cabinet:
a.
b.
c.
d.
e.
f.
5.
Remove the inner protective packaging. Retain the parts kit box, ramp brackets, and ramp extension
packed at the top of the cabinet.
6.
Recycle the remainder of the outer shipping container and the inner protective packaging in a responsible
manner.
7 .
Inspect the contents for any evidence of physical damage, and compare each item with the Bill of Lading.
If damage has occurred or shortages are evident, contact an Eaton service representative immediately to
determine the extent of the damage and its impact on further installation.
3-12
Eaton 9E UPS (80-200 kVA, 380/400/415V) Installation and Operation Manual
NOTE
For the following steps, use pincer type pliers or a large flat blade screw driver to
straighten the securing tabs.
Straighten the tabs securing the top panel of the wooden container to the side panels of the
container.
Remove the top panel and retain for later use as a ramp in unloading the cabinet from the pallet.
Straighten the tabs securing the side panels of the container to the front and back panels of the
container.
Remove the side panels.
Straighten the tabs securing the front and back panels of the container to the bottom of the container.
Remove the front and back panels.
NOTE
While waiting for installation, protect the unpacked cabinet from moisture, dust, and
other harmful contaminants. Failure to store and protect the UPS properly may void
your warranty.

Figure 3-4. UPS Cabinet as Shipped on Pallet (wood container removed)

Figure 3-5. UPS Cabinet as Shipped on Pallet (wood container removed)
UPS Installation Plan and Unpacking

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

93e

Table of Contents