Annual Start·up A; Na Nce Schedule - Weil-McLain GV90+ Installation And Start-Up Manual

Series 2 gas-fired water boilers
Hide thumbs Also See for GV90+:
Table of Contents

Advertisement

GV90+
Series 2
oAs·FIRED WATER BOILER -
Boiler Manual
Annual start-up and general maintenance schedule
Figure 77
Se<Vice
and
maintenance schedules
Service technician
(see
folowtng
pages
f<lf
Instructions)
68
Gen eral:
Address reported problems, page
6Q.
Inspect boiler
area,
page
60.
Inspect boiler interior, page
69.
Inspect oondensate
drain
system,
page
60.
Inspect
all
piping
for
leaks, page
69.
Inspect gas
piping,
page
69.
Inspect the
'vvater
system,
page
60.
Check
water
system
chemistry,
page
60
Inspect
expansion
tank,
page 70
.
Inspect a
ir
openings, page 70
.
Inspect
vent system
and
air
piping,
page
70.
Inspect boiler heating surfaces, page 70
.
Inspect igniter, page 70
Inspect temperature mixing
system,
page
71.
Inspect additional oontrols and
cutoffs,
page
71.
Inspect
gauges,
page
71
.
Inspect
blower
motor, page
71
.
Inspect oiled-bearing
circulators,
page
71
.
Inspect temperature sensor, page
71
Inspect boiler
relief
valve,
page 72
.
Additiona
l If combustion or
performa
n
ce lndlc- . th•
n
eed:
Follow procedures
under
Cleaning
boiler
heating surfac:es, page 73 to access
boiler
components listed
below.
Clean
hEllat
exchanger:
Remove and clean
burner
using
compressed
air
only.
• Vacuum
1he
blower.
R•
vlew:
Reviev.'
with
O'INI1er.
The boUler contains ceramic fiber
and fiberglass
materials.
Use care
when
handling thesto
mat~rials
ptr
insrrucl
ions on
pag~
106
of rhis
manuaL
Failure to
comply
could
rtsulr in
severe
personal injury.
Owner maintenance
(see
folowtng
pages for
Instructions)
Check
boiler
area
Check
air
openings
Check pressure gauge
Check
boiler interior
piping
Check venting system
Check
air
vents
Check condensate
drain system
Check
relief
valve
Test low
water cutoff (if
used)
• Clean vent terminationtair
intake
screens
• Oil blower
motor
Operate
relief
valve
• Shut
down procedure
Follow
the Service and maintenanct
proctdures
given
throughout
this
manual
and
in
component literature shipptd
with the
boiltr.
Failure to perform the Str'Vice and maintenance could result in
damage
to
the boiler or systtm. Failure to follow
the
directions
in
this
manual and component
literature
coukl result in severe
personal
injury.
death or substantial
property damage.
Pan
number
550-142-783/1012

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qv90+3Ov90+4Qv90+5Ov90+6

Table of Contents