Weil-McLain GV90+ Installation And Start-Up Manual page 2

Series 2 gas-fired water boilers
Hide thumbs Also See for GV90+:
Table of Contents

Advertisement

GV90+ Series 2
oAs·FIRED WATER BOILER -
Boiler Manual
How
it
works •••
1
Integrated
boiler
control
The
integrated
boiler
control
(I
BC)
responds to signals from the room thermostat, air
pressure
switdl,
i:nlet
water
sensor, boiler wa.ter temperature
sensor
and
boiler lim
it circuit
to operate
the
circulators,
gas
valve, igniter and blower. When a
room
thermostat caU
s
for
heat,
the IBC starts the system circulator and
blower.
The
JBC
runs
the
biO'\\•er
to
purge the
boiler
flue
passages,
then
turns
on
the
igniter and
lets it warm
up.
After igniter
warm·
up,
the
I
DC opens the
gas
vah-e, rurns
the
igniter off, and checks for
flame. The flame
must
come
on
within
4 wconds or
the
me
will
shut down and
try
the
full cyde again.
W
hen
the
room
thermostat
is
satisfied.
the IBC
turns
off
the
boiler components and
wai.ts
(or
the
next
beat
call.
The
IBC
indicator
ligh.ts show nonnal sequence when the lights are on steady. When a
problem
occurs, the
JBC
flashes
combinations of
lights
which indicate
the most
bkely
reason for the
problem..
Wh
ile attempting to
satisfy the heat
demand, the
control
module monitors the
boiler
temperature
changes
via the temperature
sensors
and
determines whether or
not
the
available hot water w.tll satisfy the demand,
only
running
the
ci:rculator. If additional
heat
is
needed,
the sequence conti:nues..
When
DHW
(if
used)
caJJs
for
heat.
sequence
above
is
bypassed.
2
Transformer
The
control transformer reduces
line
vottage
to
24
volts for
the
gas
valve and limit ci:rcuit.
3
Blower
The
blower pulls
i:n
ai:r
and mixes it
with
gas
&om
the
gas valve. The bla\\'et forces this
mixturt into
lhe
burner
for
comlxu:tion
inside-
the-
boiler chamber.
4 Recuperator
The recupenttor
is
a
stainless
steel beat
exchanger
that
increases
boaer efficiency
by
ex·
trading
additional beat
&omthefluegaws,
Return
waterpasws
through
the
recuperator
before entering
the
boiler.
5
Water
temperatur
e sensor
The
wat~r t~mptralur~
sensor
provides
a
signal
to
the
conrrol
module to turn
off
rhe
gas
valv~
if the
temprratur~
in
the boiler
goes
abo~
its setring. (The
circulator
wlll
conrinue
to
run
as
long
as
there is a call
for
heat.)
6 System circulator
The system circulator
circulates
water
through
the
external (S)'Stem)
piping,
The
flow
ra.te
ofthecirculator i:s controlled
by
the
IBC, depending
on
the
temperature
of
the water
entering the boiler
.se<tion$.
Pump
mu.<n
remain
on
boiler
-
do not
remove.
7
Bypa
..
circulator
The
IBC operates the bypass
circulator
to
mi.x
hot
water
from
the
boiler
outlet
with
colder return
"'
a
ter
from
the
S)'Stem
as
needed
to prevent condensation of
flue
gases
in
the cast iron
heat
exchanger.
When
the
water
returning
to the
boiler
Is
below
I
W
F
.
the IBC regulate$
the
bypass
ci:r·
culatorand
system circulator
flow
rates
to
raise
the
return
water
temperature
up
to l40'"F
before
it
enters
the
cast
iron
sections, By
balancing these flow
rates. the IBC
can protect
agai:n.st condensation in
the
cast
iron
heat exchanger
e\'en if return water
Is
as
low
as
6Crf.
Pump
mU$t
remain o
n
boiler
-
do
not
rem
m-e.
8
Air pre
..
ure
switch
The
ai:r
pressure switch
signals
the
IBC.teUing the control
whether
air is moving through
the blower.
9 Return water temperature
sensor
2
The
water temperatUI'e
sensor
monitors
the
temperature
of
the water entering
the
boiler
sectfons.
The sensor
sends
this
Information
to
the
IBC.
The IBC determines how
much
to
adjust
the
cirrulator
flO\\'
rates to provide at least 140'"P water to
the
cast iron beat
exchanger.
LEGEND
a
Supply
to system>
1"' NPT
b
Return from
system,
I"
NPT
c
Combustion
air
lnlet
fitting
-
3"' PVC connection
d
FJue outlet
-
3"'
PVC
conntc·
tion
e
Gas vaJve
-
negative
p
r~ssurt
regulated
gas
control
I
Pressure/temperature
gauge
g
FJueway
inspection
port CO\'tr
h
Stnsor
hose trap
Manual
air
vtnt
Relief vaJ\·t
k
Thermal
fuse-
a o
ne·
time fuse
device
that
shuts
boiler
off
if flue
te:mptrature exceeds irs
strpoint
m
Condtnsate
trap
line -shipped
loose
with
boiler,
field installed
n
Condensate d rain connection-
W'
PVC female
This
boiler
uses
a
negarive·
prtssurt-
rtgulattd
gas valve,
ser
for an
outlet
pressure approximately
-0.
20"'
water
column.
00 NOT
set
rhe
outlet
p r~ssurt
higher
than
facto ry
setting.
Pan number
550-142-783/1012

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qv90+3Ov90+4Qv90+5Ov90+6

Table of Contents