Weil-McLain GV90+ Installation And Start-Up Manual page 37

Series 2 gas-fired water boilers
Hide thumbs Also See for GV90+:
Table of Contents

Advertisement

GV90+
Series 2
oAs·FIRED WATER so1un
-
BaUer Manua
l
DIRECT VENT -
Sidewall with W-M vent/air
plate
Allowable
vent/air
pipe
materials
&
length
a
IAWAIINING
I
Use
only
the vent materials and kirs
listed in Figure 40, page 33. Provide pipe
adapters if
spec.i.fied
I.
Locate the termination such rhar the
total air
piping
and
vtnr
piping f'rom the boiler to the
termination
will
not exce-ed
the
maximu
m
length
g
iven
in
Figure 39, page
32.
Determine
termination location
I.
The
vent/air
cap mu.sr be installed
as
shown
in
Figure
~
page
38.
2.
The
termination
must
comply with dearances
an
d
limitations
shown in
Figure
41>
page
35.
3.
Locate the
termination
so
it is no
t
likely to
bt
damaged
by
foreign
obj«rs,
such
assrones
or
balls,
or subj«r
to buildup of
lea\'fS
or
sediment.
Multiple vent/air
terminations
I.
W
hen
rerminaring
m
u
lriple
GV90+
boiiNs,
rerminare
each
vent/air
connection as described
in
this
manuaL
IAWAIINING
I
All
vent
pipes and
air
inlets must
t~rm
inare
at the
same height to a\'Oid
poss.ibility
of
sever~
personal
injury,
deatll
o
r
substantial
property damage.
2.
Place
wall
pen~trations
to
obrain minimum
dear-
anct as
shown.
in
Figure 44
for
U.S. installations.
For Canadian installations. provide clearances
re-
quiredbyCSA
8
149.
1 or
Bl49.21nstallationCode.
3.
The
air
inlet o-f a
GV9G+
boiler
_is parr of
a dirtct
vent
connection.
It
is
not
dassified as a
forced
air
intak~
with
r~g.ard
to spacing
from
adjactnr
boiler
\'fnts.
4.
Combustion a.ir
(NOT
\'fnt
piping)
can
be
mani-
1\>lded as shown
in
Figure
~7,
page
~
1.
NOTICE
The
Weii-Mclain
venr/air
termination
capo can
be
used ro terminate the •tent
p
ipe
for
multiple
boiler applications
using the
manifolded
combustio
n
air
optio
n.
The
ven
ts must be
lo-
cated following the restrictions
in Fig-
ure
41.
page 35
and
f
igure
38,
page
31.
Part
number
550-14-2-783/1012
Fi
gure 43
INSTALLATION
-
W·M
sidmwall
venValr
plata
·<:Oil
-
~
-
..
<iii)
Step 1
lkadand. follow
all
fnstruc'tKms fn
claili
manual.
DO NOT
proCCKid
wtth
venValr
Installation until
you hav• r•ad
page 29 through page
35.
Step 2
Install
the
b<>iJer
in
a
location
that
aJJows
proper
routing of
all
\'fnt
and
air
pip ing
ro the
se-lect~
sidewall
location.
Sttp3
Make
sur~
tile
selected
sidewall
termination
location com-
plies
with
Figur< 41, page 35. (Multiple
boiler
sidewall plates
must
also
comply
with
Figure 44, page
38.)
Step
4
Use
only
the
• tent
materials
listed
in
Figur~
40.
page 33.
Provid
e
pipe
adaprers
where
required.
Step 5
Vent piping and
air
p iping
lengths
must not
exceed the
\<alues
sllown
in
Figur~ 3~.
page 32.
Step 6
Prepare the
.sidewall
penetrations and
secur~
the
sidewall
plates as
instructed
in
this
section.
See ''
l
nstaJJ
Weii-Mclain
\'fn tlair
cap-"
on
page 38.
Step 7
The Weii-Md..ain
plat~
termination
musr
be
installed
before
piping from
the
boiler
to the
termination.
Step 8
Install
venr and
air
pipin
g
between
the
boiJt
r
and the
wntl
air
termination
plate.
Slope
hori1..0nt.al
piping downward
roward
the
boiler at
least
1
/4
inch
per fooL
See
pag~
48 fo
r
general
guidelines.
Step 9
Install
pipe
supports every 5 fffi on both the
horizontal
and
\'frtical
runs.
Step 10
Install
a hanger
support
within
6 inches
of any
upturn
in
the
piping.
37

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qv90+3Ov90+4Qv90+5Ov90+6

Table of Contents