Weil-McLain GV90+ Installation And Start-Up Manual page 39

Series 2 gas-fired water boilers
Hide thumbs Also See for GV90+:
Table of Contents

Advertisement

GV90+
Series 2
OAS•FIRED WATER BOIUll
-
BaUer
Manual
DIRECT VENT -
Sidewall with
separate
pipes
Allowable vent/air pipe
materials
&
length
a
IAWARNINGI
Use
o nly the
\'tnt
mattTials and
kits
listed
in
Figure 40, page 33. Provide
pipe
adapters
if
spedfu!d.
I.
Locate rhe
ter
m
ination
such
that
the tot:aJ
air
piping and vent piping f'rom
the
boiler
ro the
termination
will
n
or
exceed the
maximu
m
length
giwn in Figure 39, page
32.
Determine termination
location
I.
The
air
and
\'tnt
terminations
must
be
in-
stalled as
shown in
Figure
47, page 39 and
Figure 49,
page
40.
2.
The
renninations
must
comply
with
d
earanct'S
and
limitation.s
shown
in
Figure
4
t.
page 35.
3.
Locate
the terminations so they are
not
likely
ro be
damaged
by
foreign
objects, such
as
srones
or
baJis
..
or
subject to buildup of
leaves
or
sediment.
IAWARNINGI
Do
oot
ex~
rhe maximwn lengths
of
~f
0\&tJid¢
V¢0'
piping
shown
in
Figu:re 47,
page
39.
Excessive length
exposed
ro the
o
utside
could cause
fr~zi
ng
of
condensate
in the vent
p
ipe:.
resulting
in potential boiler
shurdown.
In
extremely cold
eli-
mares,
insrall an
insulated chase
around
rhe
vent
p ip ing,
par
ticu-
larly
when
usinglongerlengr.hs.
The
chas~
musr
aJiow for inspttrion
of
the
vent
p
ipe, and insularion
must
be
p
ro
tected f'rom water.
Multiple
vent/air terminations
I.
·
w
hen
rermin.aring
multiple GV90+ boilers,
renninate eac
h vent/air
connecrion as
de-
scribed
in
this
manual
lA
WARNlNG!
All
'lent
pipes and air inlets must
term inate at
rhe
same height
ro
avoid
possibility
of
St\·ere
personal
injucy.dear.h
orsubsrantial
properry
damage.
2.
Place
wall
penetrations
to obtain minimum
clearances
shown
in
Figure 48,
page 40
for
U.S.
installations.
For Canadian
installations,
providedeara.nces
r~ui
redbyCSA
B
l49.1 o
r
8149.2 1nstallarion Code.
3.
The air
inler of a GV9()+
boiler
i.s part
of a
direct
vent
connection.
It
is
not
c.
l assified
as
a
fo rced
air inrake
with
regard to spacing
from
adjact-nr boilell' vents.
4.
Combustio
n
air
(NOT
\'ent
piping)
can
be
manifolded as
shown
in
Figure 37,
page
31.
Part
number
550-1+2-783/1012
Figure
47 INSTALLAllON
SEQUENCE
-
Separate
pipes
s
ioowall
,..,.. lin - -
.....
Sttp 1
Read and
(cHJow
all inscructiom; in
tMS:
manual.
DO NOT proceed with
vonVIIir
inalallatlon
until
you have
read-
29 U.Ough - ·
35.
Sttp
2
Install
the
boiler in a 'oat bon that allows
proper
routing
of
all
\l!nc
and air
piping
to the selected
sidewall
location.
Sttp 3
Make
sure the
selecced
sidewall
termination 'ocation complies
with Fig-
ure
4
1,
page
35.
(Muhiple boiler
sidewall
places
must
also
comply
with
Figure 48,
page
40.)
Sttp
4
Use
only
the
veru materials Listed
in
Figure 40.
page
33.
Provide pipe
adapt-
ers where required.
Vent
piping
and air
piping lengths
must
not
exceed
the
values
shown in Fig.ure
39,
page
32.
St tp
S
Prepare
the sidewall penetrations and
secure
the
sidewall
plates
as instructed
in this
section.
See •prepare
wall
peneu
ations• on
page
40.
Sttp 6
The
air
piping
mu.<;t:
termi:nate
in
a
down-tumcld
elbow
as shown above.
The
vent
piping
must terminate in an
tlbow pointed
outward or
INlay
1rom
the
air Jnlet
as
shown
above.
See illustration
above.
Sttp 7
Install \'eat and
ai:r
piping
between
the boiler and
the sidewall
openin&$-
Siope
horizontal piping downward coward the boiler
at
least
114
inch
per
foot.
See page 48
for
general
guideli:nes.
Sttp 8
Install
pipe supports
e'l'e:f'Y
5
feec
on
both
the
horizon
cal
and vertical runs.
Install a
hanser
support
within 6
inches
of any
upturn in
the
piping.
Sttp 9
Attach
the
wmt
tmnination
exterior
piping:
U
se
either
of
thec.onfigunttions
shown
above, as needed to ensure clearance abo\>e grade
or
snow Line:.
Sttp 10
The vent
and
air
pipes
may run
up
as
high
as 4 feet
with
no enclosure.
The
\'C!OC
and
air
pipes
must
be secured with braces, and all dearances and
lengths
must
be
nwuntained.
Space
braces no further ttum
24
inches
aparc.
Sttp 11
External \'tilting greater
than
4 feet requires an
insulated
enclosure around
the \'tnt
and
air
pipes.
The
vent
and
air cenninations must
exlc
through
the
mdo:sute
as
shown
in
the
illustration above, maincai:ning all required
clearances.
39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qv90+3Ov90+4Qv90+5Ov90+6

Table of Contents