Weil-McLain GV90+ Installation And Start-Up Manual page 38

Series 2 gas-fired water boilers
Hide thumbs Also See for GV90+:
Table of Contents

Advertisement

GV90+
Series 2
oAs·FIRED WATER BOILER
-
Boil
er Manual
DIRECT VENT -
Sidewall with
W-M
vent/air
plate
rconunuad)
Install
Weii·Mclai n vent/air cap
I
NOTICE
I
The
inside
and
outside
cover
plates
are
stamp«!
to
iden-
tify
the exhaust (vent)
and
inrakt (air} openings.
Makt.
sure to orient
tht plates
corrttd
y.
1.
Locare tennin.arion opening and a..,.oid
obstructions:
a.
Use
the template supplied with the
termination kit.
b.
Locate
the template
on
the
outside
building surface whtTt the
penetration
is co be
made.
c. Makt
sure ther.t
will
be
no obstructions rhar
might
prevent
proper plactment
of
the
termination.
d.
Use
the
template
to
mark
the locations
for
the
four mounting
boles,
flue pipe
and
air
pipe. Level the template with a spirit
level.
For the Wtii-McLain
plart,tht
template
must
be level
tu
ensure
the
flue
and
air
pipe
will
be
side-to-side,
as shown
in Figure
45.
Failure
to comply could
result
in
severt.
peMnal
injury, death
or
substantial
property
damage.
e.
Cut holes
in
the wall as
shown
in
Figure 46, using the location
marks made
with the
tmlplate.
For
besr result:s,
use
a
small-
dlameter,
longdrill bit
to
drill
centering
boles for the flue and
air
pipe
openin.gs.
Then
drill
the large openings
from
both
r.he
inside
and outs;ide.
f.
The flue
pipe
and air
pipe
may
be
run
through a rectangular
cut<lul
(as
marked on the template) in
lieu
of two ll!parat<
holes if
desired.
2.
Drill
holes
for
the screws
or
plastic anchors
to
secure
the
outside
plate.
lnstaJl
the outside
plate
and
mount
the tenninarion
on
r.he
plate (temporarily).
a.
CUt
the
flue
pipe so
the
extension
through the
wall will cause
the
\-tnt
pipe
t:o
fully exttnd into
rhe termination
socket.
b.
Cut the
air
pipe
so
the
exrension
through the
wall
wiJI
buu
r.he
air
pipe
againsr: the stops
inside
the termination.
c.
Temporarily
slide the
flue
and air
pipes through
tbeopening(s).
Slide the inside
wall
plateO\'fr
the two pipes and
into
position
on the inside
W"all.
d.
Position the inside plate so
the flue
pipe
and air
pipe slope
downward
siigMy
toward
the boiler (
t/4"
per foot).
e.
Mark r.he
four
(4)
mounring
holes
for
the plate.
f.
Remove
the
\-tnt and air
pipe>
drill
the
four
mounting
holes,
and mounr
the inside
plate.
3.
Test
fit the
't-ent/air termination on
the
vent
pipe.
Make
sure
the
vent
pipe
fully pentrrates r.he termination
socket
and
r.he air pipe
butts againsr the
interior
stops.
4.
Apply
silicon
RTV
se:alanr to the
interior
of the vent termination
and slide onro venr
pipe.
Rotate slightly
to
spread r.he
silicon
to
ensure a
tight
seal around the
\-tnt
pipe.
5.
S&u~
the
termination
in place using
the
four #10
x
'11"
sheer
met
Ill
scr~s
and
lock
washers
(s~
Figure
46).
38
Figure
44
Multiple
lemlinations
-
Wail-Mclain
vooV
air plale
-
clooranoo from
vMr
of one
1
0
aif
intake
olthe
next
.......
Figure
45
HoitO
preparatioo
'"wall
-
Weli·Mclain
vent/air
plat<'!
(use
template
provid.ed)
Figure
46 Tenninalion
assembly
-
Well-Mclain
Vfi'lt/~r pl~e
P3n
number
550..1<42-7831101"2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qv90+3Ov90+4Qv90+5Ov90+6

Table of Contents