Annual Start-Up And General Maintenance Schedule - Weil-McLain 2 Series Manual

Hide thumbs Also See for 2 Series:
Table of Contents

Advertisement

series
GV90+

Annual start-up and general maintenance schedule

Service and maintenance schedules
Figure 77
Service technician
(see following pages for instructions)
General:
• Address reported problems, page 69.
• Inspect boiler area, page 69.
• Inspect boiler interior, page 69.
• Inspect condensate drain system, page 69.
• Inspect all piping for leaks, page 69.
• Inspect gas piping, page 69.
• Inspect the water system, page 69.
• Check water system chemistry, page 69.
• Clean and refill condensate trap, page 69.
• Inspect expansion tank, page 70.
• Inspect air openings, page 70.
• Inspect vent system and air piping, page 70.
• Inspect boiler heating surfaces, page 70.
• Inspect igniter, page 70.
• Inspect temperature mixing system, page 71.
• Inspect additional controls and cutoffs,
page 71.
• Inspect gauges, page 71.
• Inspect blower motor, page 71.
• Inspect oiled-bearing circulators, page 71.
• Inspect Temperature/LWCO sensor, page
• Inspect boiler relief valve, page 72.
Additional if combustion or
performance indicates the need:
• Follow procedures under Cleaning boiler
heating surfaces, page 73 to access boiler
components listed below.
• Clean heat exchanger.
• Remove and clean burner using compressed
air only.
• Vacuum the blower.
Review:
• Review with owner.
The boiler contains ceramic fiber
and fiberglass materials. Use care
when handling these materials per
instructions on
manual. Failure to comply could
result in severe personal injury.
68
gas-fired water boiler – boiler manual
2
71.
page  106
of this
Owner maintenance
(see following pages for instructions)
• Check boiler area
Daily
• Check air openings
• Check pressure gauge
• Check boiler interior piping
• Check venting system
Monthly
• Check air vents
• Check condensate drain system
• Check relief valve
• Test low water cutoff
Periodically
• Clean vent termination/air intake
screens
• Oil blower motor (if required)
Every 6
months
• Operate relief valve
End of
• Shut down procedure
season
Follow the Service and maintenance procedures given throughout
this manual and in component literature shipped with the boiler.
Failure to perform the service and maintenance could result in
damage to the boiler or system. Failure to follow the directions
in this manual and component literature could result in severe
personal injury, death or substantial property damage.
Part number 550-143-010/1021

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gv90+Gv90+3Gv90+4Gv90+5Gv90+6Gv90 plus

Table of Contents