Weil-McLain GV90+ Installation And Start-Up Manual page 53

Series 2 gas-fired water boilers
Hide thumbs Also See for GV90+:
Table of Contents

Advertisement

GV90+
Series 2
OAS•FIRED WATER BOILER -
Boiler
Manual
DIRECT EXHAUST -
Vertical
Allowable vent/air pipe
materials
&
length
a
IAWARIINO!
Use
only
the
vent
materials
and kits listed
in
Figure
40,
page 33. Provide pipe
adapt-
ers
if specified.
I.
Locate the termination such
rhar
the
totaJ
air
piping
and
vent
piping from the
boiler
ro
the termina
-
tion
wiJJ
nor
exceed the maximum length
given
in
Figure
39,
page
32.
Determine termination location
I.
The
vt-nr tenn;nations
musr
be
installed as
shown
in
Figure
63, page 53.
2. The
terminations
mu.srcomply with dearances and
limitations
shown
in
Figure 41,
page
35.
3.
Locate
the termination
so
iris
not
likely
tO
be
dam-
aged
by
foreign
objects,
such as stones or balls,
or
subject to
buildup
of
leaves
or
sediment.
Multiple vent/air terminations
I.
Terminate
each vent of
multiple direct
exhaust
GV90+ boilers as described
in this manual
for
indiv
iduaJ ven
ts.
2.
Space terminations
as
required
fo
r
best
installation
practices
and r.equirtd
mainrenance.
Prepare roof penetration
I.
Venr
pipe
penetration:
a.
Cut
a
hole-
for
the vent
pipe.
For
either
com-
bustible
or
noncombustible
construcrion, size
the
ve~t
piJ?e
hole
at
least
O.S
..
Iarger than rhe
vent
p1pe
diamerer.
b.
Hole diamerer
in
the
mrtal
places
must
be
at
least
4"
for
PVC
pipe.
For
AL29-4C
vent
pipe
and coupling
(or
elbow) -site hole
0.5"
larger
than vtnr
p
ipe
outside
diamerer.
c.
lnserr a
gah'lllliud
meral
thimble
in rhe vent
pipe
hole.
2.
FoliO\•
all
local
codes
for <solation
of
vent
pipe when
passing
through
floors,
ceilings and roof<
3.
Provide
flashing
and seaUngboots
stud for
the
vent
pipe and
air
pipe.
NOTICE
\"'heff
the
\-ent
penetrateS
the
roo~
the
an-
nular
space around
the
pe-netration
must
be permanendy
sealed
using
approved
marerial.s
to
prevent
entry
of
combustion
produtiS intO the building.
Part
number
550-14-2-783/1012
Figure 63
INSTALLAllON SEQUENCE
-
Direct exhaust
vertical
6
~Bird
screen
Vent
termination
coupling
Step 1
Read and fo!
low
aU
"instructions
in
thts
manual. DO
NOT
proceed
wtt
h
ventlalr lnstallallon l.l"'dl you have read
pago 29
through
pago 3S,
page 49 and page 50.
Step 2
Install rhe
boiler in
a locarion that allows
proper
routing of
all \"
tnt
and
air
piping
to rhe selecred
sidewall
location.
Step 3
Make
sure
the
select~
vertical
termination
location
com-
plies with
Figure
41.
page
35.
Step
4
Use only
the
venr
materials listed in
Figure
40,
page
33.
Provide pipe
adapters
where
requir~.
Vent piping and
air
piping
lengths
must
not
exceed
the \'alues shown
in Fig-
ure
39, page
32.
Step
5
Prtpa~
the
vertical
ptnerration
and
kC'Urt
penrtration
componenrs
as
instructed in
this
section.
See
«Prepare
roof
penetrations"
on page
43
and
"Termination and
fittings"'
on
page
44.
Step 6
The
\'tnt
piping must
terminate
in
a
coupling
pointed
upward
as
s.
"
hown
abo\rt.
Step 7
Install
\'tnt
and
air
piping
between rhe boiler and rhe ..
-~rti­
cal
termination.
Slope
horizontal
piping
downward toward
the
boiler
at lease
1/4
inch
per
foot.
Install
pipe
supporrs
e-.·ery
5
feet
Qn
both
the
hori7.onml
and
verrical
runs.
Install
a
hanger
supporr
within 6 inches
of
any
upturn
in
the
pip-
ing.
See page
48
for
general
guidelines.
Step 8
Maintain
minimum
dearance
ofo/u1
inch
between
vent
pipe
and
any combustible
waJJ or
mat~rial.
Step 9
lnserr
the
\rt:nt
piping
through
the
\rtrtical
penetration
and
secure
the rermination
coupling.
Step 10
Maintain clearances
shown
abo..-~.
Venr
t~nn inarions
must
be fitted witih a
bird
sc.reen
as shown
53

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qv90+3Ov90+4Qv90+5Ov90+6

Table of Contents