GV90+
Series 2
oAs·FIRED WATER BOILER-
Boiler Manual
Prepare the boiler
(continvedJ
Perform
hydrostatic
pressure test
Pressure test
boiler befor•
attaching water or
gas
piping
(exctpl as
noted
below)
o
r
electrical
supply.
Remove
jacket
top
panel
before
pro<t<ding.
IAWARNINGI
Use
two wrenches wh.en dghtenlng water piping at
bollar, using o ne
of
rhe
wrenches to
prevent
the
boil~r
interior
piping from
turning.
Fall
u~
to
support the boill"r
piping
connections to prevent them
from
turn ingoo~.Jid
caus.e
damage to
boiler
components.
Prepare boiler
lor
test
-
see
Figure 10
Stop 1
Connec>t a
bose from
water supply to
fill
aod
drain
boiler
for
h)rdrosraric test.
Hose
is
nor included with boiler.
Step
2
Connect
hose ro boiler drain vahre.
Make
sure
hose can
also
be
used to
drain
boiler after test
Step 3
Rtmove I"
nipple.
I" tee, bushing and
pressure/tempera-
ture gauge
from
accessory
bag.
Pipe to boiler supply con-
nection
as shown. Use
pipe dope
sparingly.
Step
4
Connect a nipple
and
shuroff
valve to system supply
connection
on
the
1"
tee.
This
val~
will
be
used
ro bleed
alr
dwilng
tbe
611.
Valve
and nipple
are
not
included "ith
boiler.
Step 5
Connect a nipple
and shuroff
valve to system rerum
c-Onnec.ti.on
at
drc.ulator
flange.
This
valve will be
1.lSled
to
bleed
alr
during
the
fill
Valve
and nipple
are
not included
with
boiler.
Step 6
Install
a
o/4•
pipe
plug in
the
rtlitf
vah·e opening. rop of
the
rear
boiler
section,
as
shown. Plug
is
not
included
with
boiler.
Fill
and
pressure test
I.
Connect
611
water
supply
through
drain
valve,
ltem
2.
2. Fill
boiler
wirh
water
(be
sure bleed valves
at
4
and 5 are op01).
3.
·
w hen
water
flows
from
bleed valves, shur
off
water
at
dtaln
\'lllve.
4.
Close
bleed valves.
5.
Slowly reopen
drain
valve
(item
2) until test
pressure
of
45
PSIG
(or
1.5 times
boiJtr
relief
valve setting- NEVER MORE
than
75
PSI
G) Ls reached on < he
pressure
gauge.
6. Tesr at this
pressure for
no more
than
10
minutes.
IAWARNNGI
Do
nolleave
boiler
unattended.
A
cold
ll~ler
fill
rould
expa.nd and cause excessive pressure, resulting
in
Si!\'t're
personal
injury,
death
or
substantial
property dama.ge.
1.
Make sure
co~rant
gauge
pressure has
been
maintained
through-
out
test. Check
for
leaks.
Repair if
found.
IAWARMNGI
Leaks
must
be
rtpaired
aronce.
Failure
t:odoso
can dam·
age boiler,
resulting
in
substantial
property
damage.
t~j•Of!Hj;l
Do
not
use
petrOleum-based
deaning
or
sealing
CQm-
pounds
in
boiler sysrem. Severe damage
to
boila
wm
occur, resulting
in substantial
properr,•
damage.
Part
number 550-14-2-783/1012
Figure
10
Piping
conneclions
for
hydrostalic lesl
Drain and
remove
fittingo
1.
Disconne.:.t fi1l water hose from water source.
2.
Dral11
bobt:r
at
drain
vahll:
or
out
hose,
whichever
pro-
vidt.s
best
access
to
dmln.
dost drain valve tuld
reJnovt
h~
after
cl.rnining..
3.
Rto:mJ
I)\'e
l'lug
{itmi
6) from
rditfvalve rappU\8;
4..
lsola.tion
viti
\'ell:
at<"
m.L
uif'C!'d
10
enable
servicing uf
th(
boiler'
s
temp«ature Sc.'nSor.
11