GV90+
Series 2
OAS·FIRED WATER BOILER -
Boiler Manual
Troubleshooting
(continued)
PRESS
SWITCH &
POWER
IAWAIVIIIOI
Electricalaho<:k hazanl
Whe<over
yoo
see TURN OFF POWER,
follow
tile
Instructions.
Faii.Jreto
follow
·
-
Instructions
CO<Jid
result in sewre
personal
In
,
dealll
or substantial
dama
e.
•
Reset
boiler control by
turning
off
power at service switch or
•
Thermostat should call for
heal
and appropriate zone valves
turning down
therrl'lOStat
for
at
least
45 seconds.
open.
Does
bloWlif
motor
operate?
No
I
Yes
Is
blow9r
wlleel ll.lrnlng at spsed of
blow9r
motor?
No
Yes
!
!
•
Remove BLOWER plug
(Figure
93,
page
SO, Item
3)
from
plug
receptacle of
IBC.
•
TURN
OI'F
POWER
at
•
Walt 5
minutes.
•
Place voltmeter leads across
tile
t
20VAC Nand 120VAC
H
se<vlce
switch.
Is purge
light naslling?
plos
of
the
BLOWER reoeptacle.
•
Properly
poslllon
bl- r
No
I
Yes
wheel oo blower motor
Does
the K>ltmeter
Indicate
120 VAC?
shaft and tighten set
flt:tOW.
No
I
Yes
(Or replace blower housing
assembly.)
!
•
Retest.
•
TURN
OFF
POWER
at service
swftch.
Does
I>/OwSr wtJeel tum freely
by
hand?
•
Boiler
!lllot.ld
be
In
nonnal
operating
se·
I
quence
(Fig
..
e
75.
page 66).
No
Yes
•
Observe ope<atlon
m
tlllhennoslatls
satJ&.
!
!
fied
and
blower
has
canpleted its
post.
purge c:ycle
.
•
Ptopert( posl4loo-
•
Replace blowe<100tor.
wheel
oo blower
111040<
shaft
and
tllghlen
set
screw. (Or
(Also
check
blower
replace
blower
housing
housing asserrbly.
•
Check oondensate trap.
assembly.)
Replace
If
necessary.)
Is th6m condensate pt8S9111?
•
RetesL
•
Retest.
No
Yes
•
Remove one
of
the
red
wires connected to
the
pressure
swHch.
Are
vent
or
comb<tstlon
air
•
Dratl
coodensata
•
Check
continuity
across
the
switch
terminals.
pasosagesb/oclced?
•
Retest
Does the
ohmmeter
Indicate
the
switch Is closed?
I
No
Yes
No
Yes
•
•
•
Replace IBC.
•
Check
air
Pressut8 swllch
pet
page 76.
•
Clear
passages and
recycle
bclter.
•
Replace
W
necessary.
•
Retest.
•
Retest.
•
Recheck
bcller
operatloo.
Part
number 550-14-2-783/1012
85