GV90+
Series 2
oAs·FIRED WATER BOILER -
Boiler ManuaJ
Annual start-up
(ccntinued)
I.
Inspect the relief \'alve
(Figure
80)
and
lift the
lever
to verify
flow as
in
the followingwamings,excerpted
from
a relief
valve
manufacturer's warning
label.
Befort
optrating
any
rtlitfvah-e,
ensure
that iris
piped
with irs discharge
in
a safe area
to avoid
sew-re scald
potmtial. Read page
12 btfore
procetding
further.
lAWAIIte«ll
Safety rt
litfvalvesshould
be
rtinsptcred
AT
LEAST
ONCE
EVERYTHREEYEARS,b)'alicen.sed
plumb-
ing
contractor
or authorized inspection agency,
to
ensure
that
the
product
has nor bet-n affected by
cor-
rosive
warer
conditions
and
to
ensure r.hat the vahre
and dis:charge
line
have
not btm alrtrtd
or
tampertd
with
iU.egally.
Certain
narurally
occurring
conditions
may corrode the valve or
its
components
over
time,
rendering
the
valve inoptrntivt-. Such conditions are
not
dtl!tctable unless
the
val
...
e and its
components
are
physica.lt)•
~moved
and insptcred. This
insptc-
tion
must
only
bt
conducttd
by a
plumbingcon-
tracror
or
authori1..td
inspection
agency - nor
b)•
the
owner.
Failure to
reinspect the
boiler
relief val\·t
as dirtcttd could muir
in
unsafe
pressure buildup,
which
can
mult
in
se-vere
personal
injur)'
,
death
or
substantial
p~ty
damagt.
14w
ARte«il
Follow·ing installarion, rhe valve
lever
must
be
op<rared
AT
LEAST ONCE A
YEAR
ro
ensure rhar
waterwa)'S art
clear.
Cerrain
naturaJiy occurring
mineral
deposits
may
adhere
to
the valve.
re-ndering
it
inop.erati\'f.
When manuaJJy operating
the lt\'fr,
water
w
ill
discharge and precautions musr be taken
to avoid contact with hot water and ro avoid wate-r
damag.e.
Before operating le""o·tr,
check
to see that a
discharge
line is
connected
ro this \<alve directing
the flow
of
bot
water
from
the
valve
to a proper
place- of
disposal.
Otherwise severe-
persona]
injury
may
result
If
no water
flows,
valve
is
inoperathe.
Shur
down boiler
until
a new relief valw has
been
installed.
2.
After
following
the- above warning directions. if the- re-lief
vah·t we-eps
or
w
ill
nor Stat
properl)•
, replace the rtlief \<alve.
Ensurto
that the reason
for
reliefvaJvt weeping is the- val\'f
and
not over-pressurization
of the- system
due
ro expansion tank
wate-rlogging
or
under-siz.ing.
72
Figure 80 Relief
valva
To complete Annual Stad-up,
perform startup and checks:
1.
COMPLETE
the
annual
start-up
procedures
beginn ing
on
page-
69.
2. Srart
boiler
and
perform checks and
te-sts
speci-
fied in
tllJs
manual
3.
Verify cold
fill
pressure
is
correct
and
that
operat-
ing pressure
does
not go too high.
4.
Complete- the check-out
procedure
on page 64.
Review with owner
1.
Review the
User's
Information
Manual
with
the
owner.
2. Emphasi:ze
the ntM
to
peri'onn
the
maintenance
sche-d.ule specified
in
the
Users
Information
Manwal
(and
in
this manual as
we-11).
3.
Remind the
owner of the
need
to
call
a
lice-nsed
contractor should the
boiJer
or
syste-m e.xhibir
any Wlusual
behavior.
4. Remind
the
owner
to follow the
proptr
shurdO't\fn
proce-dure and
tO
schedule an
annual
startup
at
the- beginning of the next heating se11$10n.
Pan
number
550-142-783/1012

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qv90+3Ov90+4Qv90+5Ov90+6