Figure 8; Table 8 - Powerware Uninterruptible Power Supply Installation And Operation Manual

Uninterruptible power supply 500 kva -- 750 kva
Table of Contents

Advertisement

4.
Connect the SCM wiring to the terminal block using the terminations shown in

Table 8---1.

Table 8---1. Supervisory Contact Module Wire Terminations
From SCM A
From SCM B (if used)
5.
Contact your local field service office for verification and testing of the SCM
and its connections prior to making connections to terminal strip TB2 shown in

Figure 8---3.

6.
Repeat steps 1 through 5 for each SCM you are installing.
7.
If you are installing an RMP or RIM in addition to an SCM, proceed to Chapter
6 or 7, respectively; otherwise, secure the UPS cabinet by reversing the steps
contained in paragraph 2.2.6.
Powerware 9315 (500 kVA- -750 kVA) Installation and Operation
164201244 REV. D 030101
TB1---4
TB1---5
TB1---6
TB1---7
TB1---4
TB1---5
TB1---6
TB1---7
To UPS
TB3---1
TB3---2
TB3---3
TB3---4
To UPS
TB3---5
TB3---6
TB3---7
TB3---8
Remarks
TWISTED WIRES (4)
1---2 TURNS PER
1 2 TURNS PER
3 INCHES
Remarks
TWISTED WIRES (4)
1---2 TURNS PER
1 2 TURNS PER
3 INCHES
8--3