Powerware Uninterruptible Power Supply Installation And Operation Manual page 50

Uninterruptible power supply 500 kva -- 750 kva
Table of Contents

Advertisement

To install a Supervisory Contact Module:
8.2
NOTE: Before installing an SCM, be sure you have prepared the UPS according to
the instructions in paragraph 2.2.6.
1.
Securely mount the SCM.
2.
Install wiring from the SCM using ½-in. conduit through the cable entry
knockout in the top of the UPS cabinet (refer to Appendix A, Drawing
164201244---7, for the location of the conduit landing area).
3.
If not already installed, locate the RMP adapter cable assembly (see
Figure 8---2) in the spare parts kit. Mate the DB---9 connector on the back of
the terminal block to the DB---9 connector (Port 1) on the Customer Interface
Panel of the UPS (refer to Drawing 164201244---2 in Appendix A). Use two
screws from the spare parts kit to secure the terminal block bracket to the
Customer Interface Panel.
Connect to
Port 1 (DB---9) on
Customer Interface Panel
8--2
Figure 8 ---2. Terminal Block Bracket
Powerware 9315 (500 kVA- -750 kVA) Installation and Operation
FUSE
TERMINAL
BLOCK
(TB3)
164201244 REV. D 030101

Advertisement

Table of Contents
loading

This manual is also suitable for:

9315

Table of Contents