Fujitsu SPARC Enterprise M5000 Service Manual page 72

Fujitsu server user manual
Hide thumbs Also See for SPARC Enterprise M5000:
Table of Contents

Advertisement

The replacefru command automatically tests the status of the component after the
remove and replace is finished.
EXAMPLE 4-2
Diagnostic tests of FAN_A#0 is started.
[This operation may take up to 2 minute(s)]
(progress scale reported in seconds)
----------------------------------------------------------------
Maintenance/Replacement Menu
Status of the replaced unit.
FRU Status
------------- --------
FAN_A#0
----------------------------------------------------------------
The replacement of FAN_A#0 has completed, normally.[f:finish] :f
----------------------------------------------------------------
Maintenance/Replacement Menu
Please select a type of FRU to be replaced.
1. FAN
2. PSU
----------------------------------------------------------------
Select [1,2|c:cancel] : C
XSCF>
Note – The display may vary depending on the XCP version.
When the tests are complete the program returns to the original menu. Select cancel
to return to the XSCF Shell prompt.
Refer to the replacefru man page for more information.
4-8
SPARC Enterprise M4000/M5000 Servers Service Manual • December 2010
replacefru command status
0.....
30.....
60.....
Normal
(Fan Unit)
(Power Supply Unit)
90.....done

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc enterprise m4000

Table of Contents