Completing The Installation - Enterasys Diamond Distributed Forwarding Engine 7KR4297-02 Hardware Installation Manual

Dfe-diamond series modules
Table of Contents

Advertisement

Completing the Installation

VT Series Port Adapter Wiring and Signal Diagram
RJ45
Pin
4
1
6
5
2
Modem Port Adapter Wiring and Signal Diagram
RJ45
Pin
1
2
4
5
6
8
Completing the Installation
Completing the DFE‐Diamond module installation depends on if the module is being installed in:
a new DFE‐Diamond module system (refer to "Completing the Installation of a New System" 
on page 3‐17), or
an established, operating DFE‐Diamond module system (refer to "Completing Installation of 
DFE‐Diamond Module in an Existing System" on page 3‐18).
3-16 Installation
DB25
Conductor
Pin
Red
2
Blue
3
Yellow
5
Green
7
Orange
20
DB25
Conductor
Pin
Blue
2
Orange
8
Red
3
Green
7
Yellow
20
Gray
22
Signal
Transmit (TX)
Receive (RX)
Clear to Send (CTS)
Ground (GRD)
Data Terminal Ready
Signal
Transmit (TX)
Data Carrier Detect (DCD)
Receive
Ground (GRD)
Data Terminal Ready (DTR)
Ring Indicator

Advertisement

Table of Contents
loading

Table of Contents