HP P2000 Reference Manual page 53

Msa system
Hide thumbs Also See for P2000:
Table of Contents

Advertisement

Create schedule Sched2 that runs Task2 for the first time on March 1, 2009, and on the first
weekday of each month, with no expiration:
# create schedule schedule-specification "start 2009-03-01 00:01 only first
weekday of month" task-name Task2 Sched2
Success: Command completed successfully. (Sched2) - The schedule was created.
Try to create Sched3 with a start time outside the "between" range:
# create schedule schedule-specification "start 2010-01-14 4:15 PM between 12:00
AM and 12:00 PM" task-name Task3 Sched3
Error: create schedule: (Sched3) - The specified start time must be within the
range specified with the 'between' parameter.
See also
• show schedule-details
• show schedules
• show task-details
• show tasks
HP P2000 G3 MSA System CLI Reference Guide
53

Advertisement

Table of Contents
loading

This manual is also suitable for:

P2000 g3

Table of Contents