Preparing the Site for M120 Router
Installation

M120 Site Preparation Checklist

Table 15: M120 Site Preparation Checklist
Item or Task
Verify that environmental factors such as
temperature and humidity do not exceed router
tolerances (see "M120 Router Environmental
Specifications" on page 227).
Measure distance between external power
sources and router installation site.
Select the type of rack or cabinet.
Plan rack or cabinet location, including required
space clearances.
If a rack is used, secure rack to floor and building
structure.
Acquire cables and connectors.
Locate sites for connection of system
grounding.
Calculate power budget and power margin.
Copyright © 2010, Juniper Networks, Inc.
M120 Site Preparation Checklist on page 37
M120 Cabinet Requirements on page 38
M120 Rack Mounting Requirements on page 39
M120 Clearance Requirements for Airflow and Hardware Maintenance on page 41
The checklist in Table 15 on page 37 summarizes the tasks you need to perform when
preparing a site for router installation.
Performed By
Date
Notes