Starting The Pt; Operation At Startup - Omron NS - SETUP Setup Manual

Ns-series programmable terminals
Hide thumbs Also See for NS - SETUP:
Table of Contents

Advertisement

3-2 Starting the PT

Check that the hardware is connected properly, turn ON the power to the PT, and then start
the PT.
Use the following procedure to start the PT.
3-2-1

Operation at Startup

When the power is ON or the PT is reset, the PT will operate as follows:
Indicator lights orange.
Indicator lights green.
Startup message is displayed.
Immediately after the power is turned ON, the indicator will light orange.
The file system will be checked and the system recovered if the power was turned OFF while
a file was being written in previous operation, or if the battery capacity was low and drive
safety information from the system program area screen data area could not be saved.
When the system starts properly, the indicator will light green.
If the indicator does not light green, the system programs may be damaged. Contact your
nearest OMRON representative.
A message about the startup status will be displayed.
If an error occurs, the PT will stop startup procedures and display a message. (Refer to Sec-
tion 5 Troubleshooting in the Programming Manual.)
If an error occurs that allows startup to continue, a warning will be displayed. When a warning
is displayed, the PT will enter standby state and wait for touch input. Check the message and
then touch the screen. The PT will continue with startup procedures.

3-2 Starting the PT

3-9

Advertisement

Table of Contents
loading

Table of Contents