Omron NS - SETUP Setup Manual page 245

Ns-series programmable terminals
Hide thumbs Also See for NS - SETUP:
Table of Contents

Advertisement

4. Check the differences, and then revise the settings for the project data or the tag.
5. To revise the settings of the host tag, click the Recompare Button to verify the tags again.
6. Click the System Menu Button to move to the System Menu. You can check the commu-
nications settings for the host and transfer memory card data.
• Tags can be used when connection is made to a CJ2H-CPU@@-EIP PLC using
Reference
EtherNet/IP.
• If ladder data is downloaded to the host, the tags will be verified once downloading
has been completed when the host tags are monitored.
Examples for the Following Screen Data
Host
Screen 1
Screen 2
While screen 1 is displayed, tags will not be verified when ladder data is
downloaded to host 2. Tags will be verified when you switch to screen 2.
• When ladder data is downloaded to the host, you can display a confirmation mes-
sage before the system starts to verify tags. For information on the setting method,
refer to 6-3-15 Setting the Tag Update Notification Message.
• The Tag Comparison Results List Screen can display up to 50 results.
Host 1 and host 2
Using tags for host 1 and not host 2
Using tags for host 2
6-11 Verifying Tags
6-71

Advertisement

Table of Contents
loading

Table of Contents