Lincoln Electric FlexCut 200 Service Manual page 111

Hide thumbs Also See for FlexCut 200:
Table of Contents

Advertisement

LINCOLN ELECTRIC
2. Carefully position the new power transformer (T1) into the machine.
3. Using a 3/8" nutdriver, attach the two right side screws securing the transformer mounting bracket
to the base of the machine.
4. Route leads X2 and X4 thru the previously disconnected cable grommet. See Wiring Diagram.
5. Using a 3/8" nutdriver, attach the two left side screws securing the transformer mounting bracket to
the base of the machine.
6. Using a 7/16" nutdriver, attach the two screws, lock washers and flat washers securing leads X2 and
X4 to the bus bars. See Wiring Diagram.
7. Route leads X2 and X4 thru the previously disconnected cable grommet in front of the snubber
board. See Wiring Diagram.
8. Using a 3/8" nutdriver, attach the screw securing leads X2 and X4 into the cable grommet in front of
the snubber board. See Wiring Diagram.
9. Perform the Switch Board Replacement
10.
Perform the
Case Cover Replacement
11. Perform the Retest After Repair Procedure.
Figure F.81 – Power transformer (T1) mounting hardware locations
Procedure.
Procedure.
FlexCut® 200 Service Manual
106

Advertisement

Table of Contents
loading

This manual is also suitable for:

12731

Table of Contents