Installation - ABB SACE Emax 2 Series Operating Instructions Manual

Low voltage air circuit-breaker
Table of Contents

Advertisement

3 - Installation

Overall dimensions E1.2 Information on the overall dimensions is available on the website:
Positioning anchor plates E1.2 The following diagram shows the distance for positioning the first anchor plate for E1.2 circuit-breakers
166 | © 2023 ABB | 1SDH001330R1002 - ECN000297030
http://www.abb.com/abblibrary/DownloadCenter/.
The following drawings are also available in .dxf format:
1SDH000999r0101
- E1.2 III-IV Fixed F EF IEC-UL
1SDH000999r0102
- E1.2 III-IV Fixed FC IEC-UL
1SDH000999r0103
- E1.2 III-IV Withdrawable EF IEC-UL
1SDH000999r0104
- E1.2 III-IV Withdrawable ES IEC-UL
1SDH000999r0105
- E1.2 III-IV Withdrawable SHR IEC
1SDH000999r0106
- E1.2 III-IV Withdrawable FC IEC
1SDH000999r0107
- E1.2 III-IV Fixed HR-VR Positionable IEC
1SDH000999r0108
- E1.2 III-IV Fixed ES IEC-UL
1SDH000999r0109
- E1.2 III-IV Withdrawable HR-VR IEC
1SDH000999r0120
- E1.2 Flange Fixed Withdrawable IEC-UL
1SDH000999r0121
- E1.2 Floor mounting IEC-UL
1SDH000999r0303
- E1.2 III-IV Withdrawable Rear Terminals HR-VR UL
1SDH000999r0307
- E1.2 III-IV Fixed Rear Terminals HR-VR UL
according to the peak current:
500/
19.69
450/
17.72
400/
15.75
350/
13.78
300/
11.81
250/
9.84
200/
7.87
150/
5.91
100/
3.94
40
60
80
Figure 104
(1): distance of the first anchor plate from the circuit-breaker terminals
(2): peak current
100
120
140
160
ABB | SACE Emax 2
L
L
L
L
Mechanical characteristics
3 - Installation