York YCAV0157 Installation Operation & Maintenance page 132

Air-cooled screw liquid chillers
Table of Contents

Advertisement

TECHNICAL DATA
Dowel Pin is 3/8" dia. for
CIP-A & 1/2" thereafter
FERROUS HOUSING
SIDE ACCESS INTERNAL
ADJUSTMENT BOLT
Turn clockwise to load
spring and maintain Free
& Operating Height.
NON-SKID NEOPRENE
ACOUSTICAL ISOLATION PAD
(Bolting to floor is not necessary for
indoor applications)
Slot Width - SW
INSTALLATION OF 1" DEFLECTION MOUNTS
1. Floor or steel frame should be level and smooth.
2. For pad installations, isolators do not normally re-
quire bolting. If necessary, anchor isolators to floor
through bolt holes in the base plate.
Isolators must be bolted to the sub-
structure and the equipment must be
bolted to the isolators when outdoor
equipment is exposed to wind forces.
3. Lubricate the threads of adjusting bolt. Loosen the
hold down bolts to allow for isolator adjustment.
4. Block the equipment 10mm (1/4") higher than the
specified free height of the isolator. To use the iso-
lator as blocking for the equipment, insert a 10mm
(1/4") shim between the upper load plate and vertical
uprights. Lower the equipment on the blocking or
shimmed isolators.
132
Illustration shows single spring CIP-B or CIP-C mount.
EQUIPMENT BASE
L
SBC
HCL
BASE PLATE DIMENSIONS
TYPE CIP DIMENSIONS (inches)†
Size
A
L
T
W SW HCL HCW MBD SBC
3
1
CIP-B
5
/ 4
8
1
2
3
/ 4
/ 2
/ 4
7
5
8
3
1
CIP-C
6
/ 8
9
/ 8
/ 16
/ 2
†Casting dimensions may vary ±1/8"
Mounting may be
operated 1/2" above
A
Free & Operating
Height.
NOTE-
CIP Mounts are not
to be used in seismic
or wind load
applications.
FREE &
OPERATING
HEIGHT
T
MAX BOLT
DIA. - MBD
All springs have additional
HCW
travel to solid equal to 50%
of the rated deflection.
Free
Ht.
1
1
1
6
/ 2
1
3
7
6
1
7
/ 2
/
/ 4
/ 8
/ 16
8
1
3
7
/ 4
1
3
7
7
6
3
/ 4
/ 8
/ 8
/ 4
7
/ 16
5. Complete piping and fill equipment with water,
refrigerant, etc.
6. Turn leveling bolt of first isolator four full revolu-
tions and proceed to each mount in turn.
7. Continue turning leveling bolts until the equipment
is fully supported by all mountings and the equip-
ment is raised free of the spacer blocks or shims.
Remove the blocks or shims.
8. Turn the leveling bolt of all mountings in either
direction in order to level the installation.
9. Tighten the nuts on hold down bolts to permit a
clearance of 2mm (1/8") between resilient washer
and underside of channel cap plate.
10. Installation is now complete.
FORM 201.21-NM1 (1223)
W
LD10577
Min
Ht.
1
5
/ 4
6
3
/ 4