Minimum Clearances - Henny Penny FlexFusion ELECTRIC GOLD COMBI FGE-615 Installation Instructions Manual

Table of Contents

Advertisement

5.1 Minimum clearances

D
B
Image: Minimum clearances to walls, ceiling or units
A
B
50 (1,97)
100 (3,94)
All dimensions in mm (in)
* Depends on the kitchen ventilation system and quality of ceiling material
** For service work 500 mm (19,69 in) recommended
The following clearances from walls, ceilings or other equipment must
be maintained when installing the unit:
Left, right and rear: at least 50 mm (1,97 in).
For service work 500 mm (19,69 in) on the left is recommended.
For parking the tray trolley, 800 mm (31,5 in) on the left.
Clearance from heat sources (baking oven), 500 mm (19,69 in) on
the left.
Clearance to deep-fat fryers, at least one length of the hand shower
at left and right.
Installation instructions
A
C *
---
Installing the unit
D **
50 (1,97)
21

Advertisement

Table of Contents
loading

Table of Contents