v Tie bars (to connect extensions)
v Install hardware
The following are required tools for the cartridge elevator:
v #2 Phillips, stubby, or right-angle screwdriver
v Flat-blade screwdriver
v 0.05 in. allen wrench
v Scissors or knife (for sizing the belt)
Figure 69 shows a typical 10U cartridge elevator assembly. The motor drive section
always goes on top, and the base section with the idler pulley always goes on the
bottom. Extension sections are mounted between the motor drive section and the
base section. All extensions are joined together with tie bars. The cartridge elevator
moves tape cartridges vertically between the modules.
1
Drive motor
2
Primary chassis
3
Motor cable (master)
4
Secondary master cable
5
Printed circuit board
6
Drive belt
Figure 69. Factory assembled cartridge elevator

Assembly

You will need a clean, flat work area such as a table or work bench. The surface
should be long enough to support the full height of the cartridge elevator. The
height is equal to the height of the stack of modules in your system. Use the
following procedure to assemble your cartridge elevator.
If you received a pre-assembled 10U cartridge elevator and the length is correct for
your system, see "Installing the cartridge elevator" on page 72. If you need to add
a cartridge elevator extension section, complete the following procedure:
1. Remove the retaining screws from the bottom plate of the cartridge elevator.
76
4560SLX Tape Library: User's Guide
7
8
9
10
11
Get other manuals https://www.bkmanuals.com
Standoff
Belt tensioner ramp and idler pulley
Belt
Elevator car
Drive belt pulley

Advertisement

Table of Contents
loading

Table of Contents