Configuring The Primary Master Module - IBM 4560SLX User Manual

Tape library
Table of Contents

Advertisement

common functions in a slave module. The following procedure prepares your
multi-module library for cartridge elevator use.
The following procedure assumes that the modules are configured for standalone
operation, that they have been rack mounted, that the system router is installed at
the top of the rack above the primary master with power off, and that the 10BaseT
cabling is not connected to any of the modules.
If the modules are not powered up, apply power to all library modules as shown
in Figure 81.
1
Power cord
2
Power switch
3
Touch screen
Figure 81. Powering up the library
1. Connect the power cord to the power supply receptacle.
2. Toggle the power switch located on the power supply to ON.
3. Press the touch screen to apply power to the module.

Configuring the primary master module

To configure the primary master module, complete the following procedure:
1. Press Menu on the primary master library touch screen.
2. Under Edit Options press Library.
3. Press the scroll down arrow until Module Configuration is visible.
4. Press the button adjacent to Module Configuration.
The Module Configuration screen is displayed.
Get other manuals https://www.bkmanuals.com
Appendix B. Adding a library module
83

Advertisement

Table of Contents
loading

Table of Contents