Installation - Hussmann DSF Installation And Operation Manual

Open fish service case
Table of Contents

Advertisement

Installation

Location
The refrigerated merchandisers have been designed for use
only in air conditioned stores where temperature and humidity
are maintained at or below 75°F and 55% relative humidity. DO
NOT allow air conditioning, electric fans, ovens, open doors or
windows (etc.) to create air currents around the merchandiser,
as this will impair its correct operation.
Product temperature should always be maintained at a
constant and proper temperature. This means that from the
time the product is received, through storage, preparation and
display, the temperature of the product must be controlled to
maximize life of the product.
Uncrating the Stand (If Provided;
Crating is Optional)
Place the fixture as close to its permanent position as
possible. Remove the top of the crate. Detach the walls from
each other and remove from the skid. Unbolt the case from
the skid. The fixture can now be lifted off the crate skid. Lift
only at base of stand!
When crating is not provided, lift at one end panel using forklift
and place a dolly under that end panel such that end panel
rests in the middle of the dolly. Repeat the same procedure
at the other end panel. Once the fixture is on dollies, move
it carefully out of the truck. This is a recommendation only.
Unloading the fixture following safe procedures is the
responsibility of the company unloading and installing these
fixtures.
Exterior Loading
These models have not been structurally designed to support
excessive external loading. Do not walk on their tops; This
could cause serious personal injury and damage to the fixture.
Setting and Joining
The sectional construction of these models enable them to
be joined in line to give the effect of one continuous display.
A joint trim kit is supplied with each joint.
• DSF glass is shipped installed to merchandiser.
• Merchandiser will arrive with shipping foam to prevent glass damage
• Cases must be set and joined prior to removal of glass shipping foam.
High risk of injury if glass shipping foam is removed
prior to transportation and or finalizing permanent location.
Leveling
IMPORTANT! IT IS IMPERATIVE THAT CASES BE
LEVELED FROM FRONT TO BACK AND SIDE TO SIDE
PRIOR TO JOINING. A LEVEL CASE IS NECESSARY
TO INSURE PROPER OPERATION, WATER DRAINAGE,
GLASS ALIGNMENT, AND OPERATION OF THE HINGES
SUPPORTING THE GLASS. LEVELING THE CASE
CORRECTLY WILL SOLVE MOST HINGE OPERATION
PROBLEMS.
NOTE:
A. To avoid removing concrete flooring, begin lineup
leveling from the highest point of the store floor.
B. When wedges are involved in a lineup, set them first.
All cases were leveled and joined prior to shipment to
insure the closest possible fit when cases are joined in the
field. When joining, use a carpenters level and shim legs
accordingly. Case must be raised correctly, under legs where
support is best, to prevent damage to case.
15
WARNING

Advertisement

Table of Contents
loading

This manual is also suitable for:

DsfiDsfmDsfnDsfn-ep

Table of Contents