Check Lists After Completing The Installation - Samsung AC BNPDBC Series User & Installation Manual

Table of Contents

Advertisement

Check lists after completing the installation

Check lists after completing the installation
After completing the installation, you must check the following.
Indoor
unit
Installation
Outdoor
unit
Refrigerant pipe work
Installing the drain pipe
Wiring work
Option
62 English
• Have you checked the external surface and the internal part of the indoor
unit?
• Is the place well-ventilated and ensures space for service?
• Have you checked if the center of the indoor unit is ensured and it is
installed horizontally in level?
• Have you connected refrigeration pipes properly?
• Have you checked the external surface and the internal part of the
outdoor unit?
• Is there any possibility of short circuit due to the heat of an outdoor unit?
• Is the place well-ventilated and ensures space for service?
• Is the outdoor unit fixed securely?
• Have you checked for any gas leakage?
• Are the length and the height difference between the refrigerant pipes
within the allowable range?
• Have you properly insulated pipes?
• Is the quantity of the additional refrigerant correctly weighed in?
• You must record the amount of additional refrigerant charging on the
service record label placed outside the outdoor unit.
• Have you completed the drain test?
• Is the drainpipe properly insulated?
• Have you checked for interference between the power and the
communication cable?
• Have you performed the earthing work 3 to the outdoor unit?
• Is the length of the wire within allowable range?
• Is the wiring route correct?
• Have you used verified power supply cable and the communication
cable?
• Check whether the vibration-resistance frame is correctly installed if
there is a possible vibration of the outdoor unit.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ac bxpdhc series

Table of Contents