Samsung AC BNPDBC Series User & Installation Manual page 39

Table of Contents

Advertisement

8 Install a square pad(t=20mm or more) to prevent vibration from the outdoor unit onto the base ground.
Place the outdoor unit on the H beam and fix it with the bolt, nut and washer. (Fix with M10 basic anchor
bolt, nut and washer.)
Anchor bolt
Nut, Spring wahser
75mm or
more
Base ground contruction
Drain hole
150 mm or more
(when Installing on the ground)
• The outdoor unit should be supported within the range of measurement below for base ground work.
Anchor bolt position
Outdoor unit
20mm
Square pad
A
A+10~20mm or more
Install the outdoor unit horizontally
on the ground
620
940
H-beam
150 mm or more
(when Installing on the roof)
Unit: mm
Unit: mm
English
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ac bxpdhc series

Table of Contents