Nortel INM 5.0 User Manual page 34

Integrated network management network wide backup & restore user guide
Hide thumbs Also See for INM 5.0:
Table of Contents

Advertisement

3-14 Administration of Network Wide Backup & Restore
Procedure 3-5 (continued)
Using the Recurring Backup option
Step
4
5
6
7
Integrated Network Management
Action
Determine the fields you want to edit.
If you want to edit the
start date of the recurring backup
start time of the recurring backup
frequency of the recurring backup
transfer rate of the recurring backup (OPC only)
number of backups to archive
storage location of the backup
Determine the date when you want the recurring backup to start. Type the
recurring backup start date into the Start date: fields.
where
YYYY
MM
DD
Note 1: Do not use a date earlier than today's date.
Note 2: Do not use a date more than 28 days from today.
Determine the time when you want the recurring backup to start. Type the
recurring backup start time into the Start time: fields.
where
HH
MM
SS
Determine the frequency of the recurring backup. In the Backup every: field,
select among
Weeks
Days
Hours
Type in the number.
—continued—
450-3101-031
is the four-digit year
is the two-digit month (01 - 12)
is the two-digit day (01 - 31)
is the two-digit hour (use 24-hour clock: 00 - 23)
is the two-digit minute (00 - 59)
is the two-digit second (00 - 59)
Rel 1.0 Standard June 1999
Then go to
step 5
step 6
step 7
step 8
step 9
step 10

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ntnm13xcaa

Table of Contents