Step
1
2
3
Connecting the server to power and starting it
For 600r servers: when you apply AC power to the 600r server, the server
starts automatically. This is part of the BIOS startup sequence. It is
important to follow the steps in the order given.
Step
1
2
3
4
5
6
Copyright © 2007, Nortel Networks
.
Action
Check that a single-point ground (SPG) is followed for every device
requiring power in the CallPilot system. Check that power cords and
UPS devices are plugged into SPGs.
Check that all connectors and cables are properly tightened down
and connected where applicable.
Check that the dongle is plugged into the proper port and the feature
key is in it.
Action
Plug the power cords into all peripheral devices, including the
monitor, tape drive, and Ethernet switch or hub as applicable to
system setup.
Turn on all peripheral devices.
Plug the power cords into the CallPilot server.
Check that the status LEDs on the power supply are lit green.
Do one of the following:
•
For the 1005r server, push the power switch on the front panel
to power on the server.
•
For the 600r server, if the server does not start automatically
when you plug in the power cords, push the power switch on the
front panel to power on the server.
Check that the status LEDs on the power supply are blinking green.
Wait while the server configures Windows 2003.
After the server automatically restarts several times, the Windows
logon screen appears.
Nortel CallPilot
Quickstart Guide
NN44200-313 01.01 Standard
5.0 11 July 2007
Connecting the server to power and starting it 45
—End—
—End—