Polaris RZR 900 2017 Service Manual page 385

Hide thumbs Also See for RZR 900 2017:
Table of Contents

Advertisement

a
20. Install new spring ring
on rear drive shafts. Apply
an anti-seize compound to the splines
21. Align the splines of the drive shaft with the
transmission splines. Push inward on the control arm
assembly until the rear drive shafts lock into the
transmission splines.
d
22. Install new fasteners
retaining the upper control
arms to the bearing carriers on each side. Torque to
specification.
23. Install the stabilizer bar link mounting bolts and new
f
nuts
. Torque to specification.
9930588 R02 - 2017-2020 RZR 900 900/S 900/S4 1000/S 1000/S4 Service Manual
© Copyright Polaris Industries Inc.
24. Install rear wheels, wheel nuts and hub castle nuts.
s
.
Torque to specification.
25. Properly lower the vehicle.
26. Install the air box assembly as outlined in the EFI
Chapter (see Chapter 4 – ETC Replacement page
4.7.
27. Install the rear bumper and cargo box as an assembly
(see Chapter 5 – Rear Cargo Box / Fenders page
11.15).
28. Connect the (-) negative battery cable.
29. Install the engine service panel
j
seats
30. If transmission lubricant was drained, fill the
transmission with the specified amount of Polaris
AGL (see Chapter 2 – Transmission Lubrication page
2.46.
Recommended Transmission Lubricant:
TRANSMISSION
TORQUE
Stabilizer Bar Linkage:
40 ft-lbs (54 Nm)
Wheel Nuts:
Aluminum: 120 ft-lbs (163 Nm)
Steel: 60 ft-lb (81 Nm)
Hub Castle Nuts:
180 ft-lbs (244 Nm)
g
, console cover and
.
FLUID CAPACITY
AGL (PN 2878068) (Quart)
Capacity: 44 oz. (1300 ml)
7
7.13

Advertisement

Table of Contents
loading

Table of Contents