Kohler K-4026 Series Installation And Care Manual page 8

Integrated toilet
Hide thumbs Also See for K-4026 Series:
Table of Contents

Advertisement

Available languages

Available languages

3.
Take out the tank.
3.1 Place an 800 x 600 mm cushion on the floor and then put the whole toilet on it.
NOTE: Operate with care to avoid scratching the surface of the vitreous shell.
3.2 Take out the tank assembly from the vitreous shell and put it on the floor.
3.3 Remove the EPE foam from the tank.
3.4 Remove the gasket and the collar.
4.
Place every part on the floor and ready for installation.
1168908-X2-B
Actuation Switch
Collar
Gasket
EPE Foam
8
Kohler Co.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents