TST-902-DSW-PMK Installation
Use the following procedures to install the TST-902-DSW-PMK.
NOTE: The TST-902-DSW-PMK preconstruction mounting kit is a TST-902-DSW mounting
accessory that is designed for preconstruction applications where mounting hardware
(without a back box) will be fastened to the left or right-hand stud of a framed wall prior to
drywall installation.
In the Box
Qty.
Description
1
TST-902-DSW-PMK, Preconstruction Mounting Kit for TST-902-DSW
Additional Items
1
Wire Jumper, Black (2007838)
4
Screw, 6-32 x 1-1/2 in., Pan Head, Phillips (2007254)
1
Cover Plate, Metal (2042716)
Install the Mounting Kit
To install the TST-902-DSW-PMK preconstruction mounting kit:
NOTES:
Ensure the chosen mounting location allows for an air gap of at least 12 in. (305 mm)
l
in the wall cavity above and below the TST-902-DSW for heat dissipation.
The wire jumper is intended to hang wires during installation to keep them away from
l
any cutting tools and should be secured in the mounting bracket as described in the
following procedure.
If the mounting bracket will not be installed onto a wooden stud, consider the specific
l
requirements for the installation. For example, installation onto steel studs will require
a different type of screw than installation onto wooden studs.
1. Position the TST-902-DSW-PMK mounting bracket against the front edge of the stud.
Ensure the extended edge of the mounting bracket is aligned with the front edge of the
stud.
60 • TST-902
Product Manual — Doc. 7750C