Fujitsu PRIMERGY RX1330 M5 Upgrade And Maintenance Manual page 361

Table of Contents

Advertisement

The minimum startup configuration consists of the following components and
cables:
Component
System board
1 CPU with CPU heat
sink
1 memory module
Common Operation
Panel (COP)
1 PSU
Table 4: Minimum startup configuration - components
Cable
Front panel cable
Power cable
Table 5: Minimum startup configuration - cables
"Shutting down the server" on page
"Disconnecting the power cord" on page
▶ Take the system down to its minimum startup configuration.
"Connecting the power cord" on page
▶ Connect a display to the server.
▶ Switch on the server, see
CAUTION
Since the fan module is not included in the minimum startup
configuration, the server must be shut down immediately after the
diagnostic process is complete (POST phase has been passed).
The minimum startup configuration must be used exclusively for
diagnostic purposes by maintenance personnel, never in daily
operation!
RX1330 M5
Notes
no TPM or expansion cards installed
installed in CPU slot CPU 1
installed in DIMM slot 1A
installed in PSU bay PSU 1
Notes
46.
57.
"Switching on the server" on page
Upgrade and Maintenance Manual
47.
Appendix A
60.
361

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents