Verifying The Connections Of The Integrated Switch Control Network - Cisco Router IOS XR Getting Started Manual

Cisco systems router getting started guide
Hide thumbs Also See for Router Cisco IOS XR:
Table of Contents

Advertisement

Chapter 3
Bringing Up the Cisco IOS XR Software on a Multishelf System
SUMMARY STEPS
1.
2.
3.
DETAILED STEPS
Command or Action
Step 1
admin
Example:
RP/0/RP0/CPU0:router# admin
Step 2
clear controller switch errdisable {port {FE | GE}
{0 | 1}} {location node-id}}
Example:
RP/0/RP0/CPU0:router(admin)# clear controller switch
errdisable port GE 1 location f0/sc0/cpu0
Step 3
clear controller switch inter-rack {errdisable
{ports { number | all} | statistics {all | ports
number }} {location node-id }
Example:
RP/0/RP0/CPU0:router(admin)# clear controller switch
inter-rack statistics all location f0/sc0/cpu0

Verifying the Connections of the Integrated Switch Control Network

This section presents how to verify the connections and operations of the integrated switch control
network with 22-port SCGEs:
Verifying the Control Ethernet Connection
To verify the control Ethernet connection on intra-rack switches, use the show controllers switch
command with the ports and location keywords, as shown in the following example:
RP/0/RP0/CPU0:router(admin)# show controllers switch 0 ports location 0/rp0/Cpu0
FE Port
FE Port
OL-10957-02
admin
clear controller switch errdisable {port {FE | GE} {0 | 1}} {location node-id}}
clear controller switch inter-rack {errdisable {ports {number | all} | statistics {all | ports
number}} {location node-id}
Verifying the Control Ethernet Connection, page 3-25
Verifying the Port Statistics, page 3-26
Verifying Bidirectionality, page 3-27
Verifying Unidirectional Link Detection (UDLD) Protocol Information, page 3-27
Verifying Spanning Tree Protocol Information, page 3-27
0 : Up, STP State : FORWARDING (Connects to - F0/SC0)
1 : Up, STP State : FORWARDING (Connects to - F0/SC1)
Purpose
Places the router in administration EXEC mode.
Clears the err-disable state of the switch port for the
RP ports.
Use the FE keyword to display the ports for Fast
Ethernet (FE).
Use the GE keyword to display the ports for
Gigabit Ethernet (GE).
Clears the err-disable state of the inter-rack switch
ports on the 22-port SCGE.
Cisco IOS XR Getting Started Guide
Integrated Switch System
3-25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ios xr 3.4

Table of Contents